Skip to content

Thyssenkrupp Levant Stair Lift Installation Manual Top -

Installing a thyssenkrupp Levant stairlift is a strategic way to restore mobility and independence in your home. This guide provides a high-level overview of the installation process based on standard technical manuals. Preparing for Installation

  1. Clean the charging contacts with a dry cloth (never wet).
  2. Check the top limit switch for debris (dust and pet hair are common culprits).
  3. Retorque the top bracket wall bolts (vibration can loosen them over 200 cycles).
  4. Inspect the rubber bump stop at the very end of the top rail. Replace if cracked.
  1. Track installation: Install the track system, which includes the rail, brackets, and screws. Ensure the track is level and securely fastened to the staircase.
  2. Chair and carriage installation: Attach the chair and carriage to the track system, following the manufacturer's instructions for proper alignment and securement.
  3. Power supply installation: Connect the power supply to the stair lift, ensuring compliance with local electrical codes and regulations.
  4. Safety features installation: Install safety features, such as sensors, limit switches, and emergency stop devices.

Chapter 1: Understanding the Thyssenkrupp Levant System

Before touching a single bolt, you must understand the anatomy of the Levant. Manufactured by TK Home Solutions (a division of Thyssenkrupp), the Levant model is renowned for its smooth start-stop technology and its robust rail system. The "Top" of the installation refers to the upper end of the rail, which includes: thyssenkrupp levant stair lift installation manual top